We maintain a rapid response team and a dedicated stockpile of materials (asphalt, aggregates, culvert sections) to begin works within 48 hours of a call‑off.
Each call‑off is priced using agreed unit rates, ensuring cost certainty for the employer. We provide detailed daily reports and photographic evidence of completed repairs. This framework model reduces procurement lead times and allows the employer to address urgent infrastructure needs flexibly. Flagship contract: KCCA Framework (UGX 37.04B, 2023–2025).
service details
Road & Drainage Repairs: Pothole patching, drain desilting, culvert replacement, and pavement rehabilitation.
Emergency Works: Response to road failures, collapsed drainage, and storm damage within 48 hours of call‑off.
Periodic Maintenance: Scheduled resurfacing, concrete repairs, and cleaning of drainage networks.