Access Road, Entebbe

project name

Construction of Access Road to Entebbe Sub-station (1.65 km)

client

Xian Electric Engineering Co. Ltd

contract value

USD 1,243,991.07

status

Completion: November 2022

The brief

This specialised infrastructure project involved constructing a heavy-duty access road to a critical power substation in Entebbe. The road was designed to withstand repeated passage of heavy plant equipment, including 100-tonne transformers and crane trucks. 

A particular challenge was the presence of high water table and soft clay soils; our team employed geotextile reinforcement and wick drains to stabilize the sub-grade. The road also incorporated drainage culverts and a turning bay for large vehicles. The client commended our ability to work within a live electrical substation environment with strict safety protocols.

Scope of Work
  •  Clearing & grubbing
  • Excavation of unsuitable soils
  • 400mm stabilized crushed stone base
  • Double bituminous surface treatment
  • Geotextile & wick drains for soft soils
  • Drainage culverts & turning bay
Location
Entebbe, Wakiso District

Our team mobilized equipment and materials to a remote location with limited road access, requiring careful logistics planning. The project was completed during the dry season to avoid weather-related delays. Since handover, the market has become a vibrant economic hub, benefiting over 300 local vendors and improving food security and income generation in the sub-county.