project name
Construction of Busibo 3 Campus Education Centre – Phase 1 and 2
client
Free Construction Limited
contract value
UGX 5,356,852,600
status
Completion: December 2023
The brief
This multi-phase project involved the construction of a modern education campus in Lwengo District, serving hundreds of students. Phase One comprised four classroom blocks with a total of 16 classrooms, each finished with terrazzo flooring, aluminium windows, and ventilated roofing. Phase Two added an administration block, a library, a fully equipped science laboratory, and sanitation facilities with rainwater harvesting systems.
Our team worked closely with the client’s educational consultants to ensure compliance with Ministry of Education design standards, including adequate natural lighting, ventilation, and accessibility features.
Scope of Work
- 4 classroom blocks (16 rooms)
- Administration block
- Library & science laboratory
- Rainwater harvesting system
- Ventilated sanitation facilities
Location
Lwengo District